Environmental
- Chapter 01 Introduction
- Chapter 02 Background to the Proposed Project
- Chapter 03 Site Selection and Reasonable Alternatives
- Chapter 04 Description of the Proposed Project
- Chapter 05 Population and Human Health
- Chapter 06 Biodiversity
- Chapter 07 Birds
- Chapter 08 Land, Soils and Geology
- Chapter 09 Water
- Chapter 10 Air Quality
- Chapter 11 Climate
- Chapter 12 Noise and Vibration
- Chapter 13 Cultural Heritage
- Chapter 14 Landscape and Visual
- Chapter 15 Material Assets
- Chapter 16 Major Accidents and Natural Disasters
- Chapter 17 Interaction of the Foregoing
- Chapter 18 Schedule of Mitigation and Monitoring Measures
- References
- Appendix 02-1 Scoping Responses
- Appendix 02-2 Community Report
- Appendix 02-3 Cumulative List
- Appendix 02-4 Cutaway Bog Decommissioning and Rehabilitation Plan (Lemanaghan, Curraghalassa, Derrynagun)
- Appendix 04-1 Site Layout Planning Drawings
- Appendix 04-2 Lemanaghan Wind Farm Amenity Plan
- Appendix 04-3 Peat and Spoil Management Plan
- Appendix 04-4 Construction and Environmental Management Plan
- Appendix 04-5 Drainage Drawings
- Appendix 04-6 Surface Water Management Plan
- Appendix 04-7 Abnormal Indivisible Load Route Survey
- Appendix 04-8 Decommissioning Plan
- Appendix 05-1 Wind Farms and Health Literature Review – Chapman (2015)
- Appendix 05-2 Impact of Wind Turbines on House Prices in Scotland – Climate Exchange (2016)
- Appendix 05-3 BHS Advice on Wind Turbines and Equestrian Access 2025
- Appendix 05-4 EMF Booklet ESB 2017
- Appendix 06-1 Bat Survey Report
- Appendix 06-2 Aquatic and Fisheries Report
- Appendix 06-3 Detailed Botanical Survey Report
- Appendix 06-4 Badger Sett Location (Confidential)
- Appendix 06-5 Biodiversity Management and Enhancement Plan
- Appendix 07-1 Species List
- Appendix 07-2 Survey Effort
- Appendix 07-3 Summary Data
- Appendix 07-4 Survey Data
- Appendix 07-5 Confidential Data
- Appendix 07-6 Collision Risk Assessment
- Appendix 07-7 Bird Monitoring Programme
- Appendix 08-1 Peat Stability Risk Assessment
- Appendix 09-1 Flood Risk Assessment
- Appendix 09-2 Laboratory Report
- Appendix 09-3 WFD Assessment Report
- Appendix 11-1 Climate Legislation Policy and Guidance
- Appendix 11-2 Carbon Calculations
- Appendix 12-1 Glossary of Acoustic Terms
- Appendix 12-2 Noise Meter Calibration Certs
- Appendix 12-3 Noise Modelling Assumptions and Inputs
- Appendix 12-4 Grid Contour Map
- Appendix 12-5 Tabulated Omni-Directional Results – V150
- Appendix 12-6 Noise Complaint Management Protocol
- Appendix 13-1 Recorded Monuments within the Proposed Project Site
- Appendix 13-2 Recorded Monuments within 5km outside the Proposed Project Site
- Appendix 13-3 Photographic Record
- Appendix 13-4 Excavations Database Entries
- Appendix 13-5 Lemanaghan Monastic Complex – Historic, Landscape and Visual Context
- Appendix 13-6 Lemanaghan SI Monitoring Reports
- Appendix 13-7 The Archaeological of Lemanaghan Bog, Co. Offaly
- Appendix 14-1 LVIA Methodology
- Appendix 14-2 Landscape Character Area Assessments
- Appendix 14-3 Viewpoint Assessments
- Appendix 14-4 LVIA Baseline Map
- Appendix 14-5 Photowire Visualisations
- Appendix 14-6 Landscape Screening Plan
- Appendix 15-1 Traffinomics Traffic Count Data
- Appendix 15-2 Traffic Management Plan
- Appendix 15-3 Galway City Autotrack Assessment
- Appendix 15-4 Road Safety Audit
- Appendix 15-5 Design Phase Procedure for Road Safety Improvement Schemes, Urban Renewal Schemes and Local Improvement Schemes Report
- Appendix 15-6 Telecommunications Impact Assessment
- Appendix 15-7 Irish Rail Telecommunications Impact Assessment
